Work in progress


Target releaseRelease 1 or later
EpicStudent will be able to run a full order execution process supported by a GUI on site level and other appropriate command tools (or GUI) at the the other layers.
Document status
DRAFT
Document owner
Designer
Developers
QA

Goals

  • Offer interesting logistical experiments to students, here: plan, release and execute the order processing.

Background and strategic fit

See Why flecsimo?

Assumptions

  • Orders will be provided from external systems or the order data is provided by the simulation manager (e. g. lecturer or lab-engineer)

Requirements (Use Cases)


Business context


#TitleUse CaseImportanceNotes
OP-1Receive OrdersOptional
OP-2Process OrdersA Production Planner accepts or creates a new production order checks its feasibility and plans the location and schedule to process it.Must have
OP-3Process SFCUsAn Area Manager controls the processing of assigned Shop floor Control Units (SFCU's)Must have
OP-4Execute Production TasksOne or more Production Worker execute or support assigned Production Tasks within a manufacturing cellMust have


User interaction and design

UC: OP-2 Process orders
A Production Planner accepts or creates a new production order checks its feasibility and plans the location and schedule to process it.
PreA new Production Order has been received.
PostThe Production Order has been released, and the corresponding information on the to-process Shop floor Control Units (SFCUs) has been distributed to the planned production areas (shops).
StepActor intentionSystem responsibility
1The Production Planner selects the "Process Order" view and selects the "check" function.

The System shows a list of all new / unchecked Production Orders.

2The Production Planner selects one or more Production Order for "Check".The Systems checks if the data is feasible to process, i.e. if the required Production Data Specification is known to the system. 
3The Production Planner starts planing of the location (area /shop) and the time schedule for the execution of the Production Order in the system. The system computes and offers the feasible planning alternatives. 
4The Production Planner selects a Planning alternative and releases one or more Production Orders. The System changes the Production Order status to "Released" and generates the corresponding Shop floor Control Data (including the required Production Data Specification) and transfers the data to the selected location
Alternatives and notes
4A

[Data not feasible] tbd


5A[No feasible planning alternative found] tbd
7A[Planning alternatives not acceptable] tbd

(Warnung) Note: both, success as problems have to be logged, any state change of the process has to be logged.


User Interaction

The wire frame shows the above use case in step 7. The user interaction could be like:

  • Select the "Process Order" View
  • Select the Menu entry on the side bar
  • Select one or more Production Orders.

You may step through the use case by stepping through the pages of following wire frame specification:



Questions

Below is a list of questions to be addressed as a result of this requirements document:

QuestionOutcome
No question yet

Not Doing

  • For first release no order editing or re-start will be possible
  • No "Housekeeping" is planned for the first release, i. e. orders may not deleted via the GUI.